VIOLENT  VOLUMES

The Hive WIP #2

The Hive WIP #2

 

The Hive WIP #2

All the stiffness of modeling environment and constraints in BIM modeling process sometimes give you frustration and less freedom in modeling but in the end it actually results more accurate, parametric (and therefore flexible) model. So the issue should be when to implement BIM after concept design stage.

 

 


Categorised as: Architecture


Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook

* Copy This Password *

* Type Or Paste Password Here *